Sequoia
  • About Us
  • Services
  • Experience
  • Career
  • Contact
  • All
  • Transportation Corridor
  • Rail
  • Bridge / Roadway
  • Airports
  • Other
Aliso Canyon Turbine Replacement

Aliso Canyon Turbine Replacement

Other
Haynes Generating Station Repowering

Haynes Generating Station Repowering

Other
Walnut Creek Energy

Walnut Creek Energy

Other

STRATEGIC QA/QC SOLUTIONS TO CONSTRUCTION INDUSTRY

  • Mid City Exposition Light Rail Transit
  • LAX – West Aircraft Maintenance Area (WAMA)
  • LAX – Southwest Terminal 1 Improvements
  • LAX – Runway 7R-25L Safety Area Improvements
  • Aliso Canyon Turbine Replacement Project
SR-91 Corridor Improvement (DESIGN-BUILD)

SR-91 Corridor Improvement (DESIGN-BUILD)

Transportation Corridor
I-15 Cajon Pass (DESIGN-BUILD)

I-15 Cajon Pass (DESIGN-BUILD)

Transportation Corridor
I-10 Desert CENTER (08-1E8604)

I-10 Desert CENTER (08-1E8604)

Bridge / Roadway
Redlands Passenger Rail

Redlands Passenger Rail

Rail
Effluent Outfall Tunnel

Effluent Outfall Tunnel

Other
SoFi Stadium (Los Angeles Rams and Chargers)

SoFi Stadium (Los Angeles Rams and Chargers)

Other
Copyright © 2021. All rights reserved
Powered By Sequoia